Load-bearing walls

Taking out a wall that’s holding up the house.

Removing or altering a load-bearing wall always needs a building permit, because it changes the structure carrying the house. The beam, the posts and the load path are designed and sealed by an outside licensed professional. We prepare the permit drawings and coordinate that design, so it’s one submission for you to manage, not two.

  • Building permit
  • Beam and posts
  • Stamped design
  • Inspection
Wall self-check

Is this wall carrying load?

  1. 01Do floor joists rest on top of the wall?
  2. 02Do roof trusses bear on the wall?
  3. 03Does another wall sit directly above it?
Your result

Start with what sits above it.

Answer yes, no or not sure. There are no wrong answers.

  • Floor joists
    Open
  • Roof trusses
    Open
  • Wall above
    Open
Have the wall checked
0 of 3 answered

A self-check, not a structural assessment. Don’t cut into a wall on the strength of it.

01

Why this always needs a permit.

Any wall carrying weight from above is load-bearing, whether that weight is floor joists, roof trusses or another wall. Removing or cutting into one changes how the house carries its own load.

Municipalities across the region treat this as a structural alteration. A building permit backed by stamped structural drawings is required. It isn’t optional, and it isn’t something a homeowner or contractor can self-certify.

02

Structural: coordinated, not ours.

The structural design is licensed work. We coordinate it for you. We don’t perform it.

  1. 01

    Beam and posts

    The replacement beam size, its material, and how the load transfers down to the foundation through new posts.

    Prepared by

    An outside licensed professional

  2. 02

    Stamped structural drawings

    The beam, the post locations and the connection details, under seal.

    Prepared by

    An outside licensed professional

  3. 03

    Permit drawing package

    Floor plans, elevations and the Building Code compliance notes your municipality needs alongside the stamped design.

    Prepared by

    Northpoint

03

How it goes, step by step.

01

Feasibility check

Confirm the wall is load-bearing and what it’s carrying.

02

Structural design

The beam and post solution, from an outside licensed professional, coordinated by us.

03

Permit drawings

The full package, prepared around the stamped structural design.

04

Submission and approval

Filed with your municipality.

05

Pre-drywall inspection

A building inspector reviews the beam and posts before they’re covered up.

04

Timeline, honestly.

On site

Often one to three weeks

For a straightforward beam and post installation.

Before that

Usually the longer part

The stamped drawings and the permit itself typically add more time than the physical work does.

A planning range, not a quote, until we’ve looked at the specific wall and span.

05

Pick the question closest to yours.

Planning to open up a wall?

Tell us which wall. We’ll coordinate the structural work and draw the rest.

We confirm what the wall is carrying first, then prepare the permit drawings around the stamped design.