ADU overview, Ontario

What is an ADU?

A second, self-contained home on a property that already has one house on it, with its own kitchen, bathroom, sleeping space and entrance. Ontario’s official term is ARU (Additional Residential Unit). You’ll also hear “second suite” or “in-law suite.” They all mean the same thing.

  • Basement apartment
  • Garden suite
  • ARU
  • Second suite
Quick answer

An ADU needs 3 things.

  1. A bedroom or sleeping area. Below grade, a bedroom usually needs a window big enough to climb out of in an emergency.

1 / 3 checked

SLEEPBATHKITCHENLIVINGOWN ENTRANCE
Typical basement apartment, plan view
01

There are only two physical forms.

Everything else (laneway house, coach house, in-law suite) is a variation on one of these.

Inside the houseADU

Basement apartment

Inside the main house

Separate buildingADU

Garden suite

A separate structure in the backyard

CompareBasement apartmentGarden suite
Where it isInside the main house (basement, sometimes main floor)A separate, detached building in the backyard
Also calledSecond suite, in-law suiteLaneway house, coach house, backyard home
Typical cost (2026)$80,000–$175,000$200,000–$300,000
Typical timelineFaster, you’re working inside an existing structureSlower, it’s new construction from the ground up
What it needsCeiling height, a proper egress window, fire separationIts own foundation, servicing, setbacks from the property line
Good fit forRental income at the lowest upfront costA fully private, standalone unit

This table is the 30-second version. See Basement Apartment vs. Garden Suite for the full comparison.

03

Two common reasons to build one.

04

Real numbers, not a lowball estimate to get you in the door.

Basement apartment, from
$80k
Basement apartment, up to
$175k+
Garden suite, from
$200k
Garden suite, up to
$300k+

Basement apartment: depends on the current state of the basement, egress work needed, and finishes. Often lower because part of the building already exists. Garden suite: a full new structure with its own foundation and utility connections, so usually more.

These are wide ranges on purpose. The real number depends on your specific basement or lot. See Cost & Financing for what drives the price up or down, and the Cost Calculator for a property-specific estimate.

05

Four stages, roughly in this order.

  1. Feasibility check

    Does your property qualify, and which path applies: as-of-right or legacy bylaw?

  2. Permit drawings

    The building design package your municipality needs.

  3. Permit submission

    Filed with your municipality.

  4. Approval and build

    Permit issued, construction begins.

Full breakdown: Process · Timeline

06

Pick the question closest to yours.

Have a property in mind?

We can tell you what looks possible.

Send us the address and a few photos of the basement or backyard. We’ll check the lot rules, the Building Code and the services, and tell you which path fits before you spend anything on drawings.